Overview

PBSC’s high-level log6 surface disinfection chamber is a freestanding, modular unit ideal for material production and equipment loads in cleanroom and high containment environments up to BSL4. At PBSC we provide decontamination solutions from market leading H202 generator manufactures ensuring regulatory compliance and consumable traceability. The chamber is designed to be intuitive allowing ease of use for facility operators.

 

Read more

Downloads

Datasheet

Features

  • Flush Maglock
  • Colour Touch Screen Robust Bumpers
  • Override Buttons
  • Stainless-Steel Hinges without Visible Fixings
  • Tacho Monitored Fans
  • Large Vision Panel Double Glazed
  • Robust Bumpers
  • Plug and play electrical spares for ease of maintenance
  • Option for air handling system without connection to the building HVAC
  • No Pit Required
  • Flush threshold allowing easy wheeled access
  • Large Vision Panel, with True Flush Glazing both sides
  • Range of aeration and air handling options to suit customers’ requirements
  • Full-service support contracts available to suit GMP and Life Science facilities

Applications

Hydrogen Peroxide WiC

The decontamination chamber with the mobile generator is ideal for various facility applications. Used globally in facilities to eradicate problematic bacteria, viruses and fungi on material loads of equipment entering/exiting controlled areas throughout the Pharmaceutical/Bio-Pharmaceutical, Containment and Biomedical sectors.

A mobile decontamination generator allows the generator to be used on other equipment and room decontamination.

Technical Specification

  • Fast Cycles from 45 minutes
  • Log6 decontamination
  • Siemens S1200 or S1500 PLC, with either 7”, 12” or 15” Comfort Touch Screens
  • Data acquisition and management to allow for 21 CFR Part 11 and Annex 11 compliance
  • H2O2 loaded on the chamber with printer above to take cycle records
  • Internal power sockets, to allow electrical items to be run during the fumigation cycle
  • Full turnkey solution including all validation

Options

  • Project Specific Approval Drawing
  • DQ package including FDS, P&ID, HDS etc
  • Installation services
  • Commissioning of Chamber
  • IQ-OQ
  • Operator Training
  • Gas Cycle Development
  • Performance Qualification
  • 6-12 months-servicing/calibration

Downloads